-   47102EP Selection of a contractor for the conclusion of a contract with the subject: "Conformity assessment of the essential requirements for the construction works and preparation of a complex report on the compliance of an investment project as well as any necessary assistance in the process of issuing a building permit, construction supervision during construction until obtaining a permit for use, including preparation of a technical passport for construction of a site: Design, construction and commissioning of a new methane - 7 00 0 m3 "

8067 ЗЗЛД.pdf
Publish Date:
Download 399.49 KB, pdf
47102EP Протокол ЗЗЛД.pdf
Publish Date:
Download 204.53 KB, pdf
47102EP Документация.doc
Publish Date:
Download 382.5 KB, doc
47102EP Обява ЗЗЛД.pdf
Publish Date:
Download 279.49 KB, pdf